FINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEW
Final YearPreview only
A project submitted to the Department of Electrical / Electronics Engineering
Design and Construction of a GSM-Based Prepaid Smart Energy Meter
By
Joseph Kamau
U/2014/ABC/0208
In partial fulfilment of the requirements for the award of a Bachelor's degree
Supervisor: Dr. P. N. Achieng
2024
FINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEW
Abstract
This project designs and constructs a GSM-based prepaid smart energy meter. The system measures consumption with a current and voltage sensing stage, deducts credit in real time, allows remote recharge via SMS, sends low-credit alerts and disconnects load automatically at zero balance — addressing estimated billing disputes and revenue loss for utilities. The study is organised into five chapters covering the introduction, review of related literature, system analysis and design, implementation and testing, and the summary, conclusion and recommendations.
Table of Contents
Chapter One: Introduction
- 1.1 Background to the Study4
- 1.2 Statement of the Problem6
- 1.3 Aim and Objectives of the Study8
- 1.4 Research Questions10
- 1.5 Significance of the Study12
- 1.6 Scope of the Study14
- 1.7 Limitations of the Study16
- 1.8 Operational Definition of Terms18
Chapter Two: Literature Review
- 2.1 Conceptual Review16
- 2.2 Theoretical Framework18
- 2.3 Empirical Review of Related Studies20
- 2.4 Gap in Literature22
- 2.5 Summary of Literature Review24
Chapter Three: System Analysis and Design
- 3.1 Analysis of the Existing System28
- 3.2 Problems of the Existing System30
- 3.3 Proposed System32
- 3.4 System Requirements Specification34
- 3.5 System Design and Architecture36
- 3.6 Database Design38
- 3.7 Use Case and Flow Diagrams40
Chapter Four: Implementation and Testing
- 4.1 System Implementation40
- 4.2 Choice of Development Tools42
- 4.3 System Testing44
- 4.4 Test Results and Evaluation46
- 4.5 System Documentation48
Chapter Five: Summary, Conclusion and Recommendations
- 5.1 Summary of Findings52
- 5.2 Conclusion54
- 5.3 Recommendations56
- 5.4 Suggestions for Further Studies58
References
Appendices
FINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEWFINAL YEAR · PREVIEW
Final YearPreview only
Chapter One: Introduction
1.1 Background to the Study
This project designs and constructs a GSM-based prepaid smart energy meter. The system measures consumption with a current and voltage sensing stage, deducts credit in real time, allows remote recharge via SMS, sends low-credit alerts and disconnects load automatically at zero balance — addressing estimated billing disputes and revenue loss for utilities.
1.2 Statement of the Problem
Builds a prepaid energy meter with GSM remote recharge, disconnection and consumption alerts. Existing approaches remain limited in reach, accuracy and ease of use, which creates the gap this study addresses.
1.3 Aim and Objectives
The aim of this study is to design and construction of a gsm-based prepaid smart energy meter. The specific objectives are to:
- review existing literature and systems related to the study;
- design and build the system using Arduino / PIC microcontroller, GSM module (SIM800), Current & voltage sensors;
- evaluate the results against the stated problem;
- make recommendations for practice and further research.
1.4 Scope of the Study
Introduction: background to prepaid smart metering, statement of the problem (estimated billing breeds disputes and revenue leakage for power utilities), aim and objectives, research questions, scope, significance of the study, and definition of terms.